schliessen

NZZdomizil
Immobiliennachfrage
im Wechselbad
 

Fürigen site Stansstad
competition 2018
2 phases, 2nd place, more+
 

Polizeizentrum Bern
competition 2018
with Büro Konstrukt
3rd place, more+
 

Development Mattli Stansstad
competition 2018
2nd place, more+
 

Nursing home
Mettenweg Stans
competition 2018
3rd place, more+
 

Project METROPOLIS
Seetalplatz Emmen
status building application
 

Development
'Moschti' St. Erhard
status execution
 

Ruswil
central redevelopment
with Eberli Sarnen
status execution

 

Lussi + Partner AG
Neustadtstrasse 3
CH-6003 Luzern
T ++41 (0)41 228 20 30
F ++41 (0)41 228 20 31
info@lussipartner.ch

 

Central and University Library, Lucerne

The cross-section of the building is designed so that, on entering the premises, visitors sense the full impact of the building’s height. Daylight floods right through to the ground floor from skylights along the eastern elevation. The reading areas and workstations are located along these new galleries. A new additional stairway connects the ground floor with the basement level. A light channel along the western façade illuminates the workspaces and the special collection, creating a continuous open-plan space inside the remodelled building and interconnecting each of the storeys. The spacious design makes the open-hand library feel bright and friendly, in keeping with the modern postulate of sun, light and air.

Building costs
CHF 18 Mio.
Commission
Study, 1st place
Building phase
2017-2019
State
under construction
Building owner

Kanton Luzern

Photos
Leonardo Finotti
Assistance

Hugo Dias

Anna Grabowska

Cooperation

ARGE Lussi+Halter, dipl. Architekten ETH SIA BSA, Luzern
General contractor: Caretta Weidmann Baumanagement AG, Zürich

Specialist planner

Construction Engineer: Bernhard Trachsel

Electrical Engineer: Jules Häfliger AG

HVAC Engineer: Peter Berchtold

Structural physics: Ragonesi Strobel & Partner AG

Project

Lussi+Halter